Upper Tama Kosi
The 456MW Upper Tama Kosi hydropower station, damaged in a September landslide, has partially resumed operations and is generating 120MW. A rockfall destroyed the control room and damaged the desander and culvert, killing two employees and two soldiers. Further repairs are ongoing to return the plant to full capacity. An initial insurance claim of Rs1.78B has been filed to cover repair costs and lost revenue.