1200MW waste

HIGH TENSION: Transmission line in Tehrathum that will evacuate electricity from several new hydropower plants in the Arun basin in eastern Nepal. Photo: KUNDA DIXIT

Nepal could be wasting up to 1,200MW of electricity this monsoon because of oversupply and not enough transmission infrastructure. The GoN taxes domestically produced transmission materials but waives duties on imports from India. Nepal’s generation capacity peaks when demand in India is lowest, so export is also not an option.