Trade losses
An estimated Rs13.53 billion in revenue collection has been lost since floods washed away the Friendship Bridge connecting Nepal and China at Rasuwagadi. Imports have been redirected to Korla in Mustang, but at higher costs and risks. China is setting up a temporary Bailey bridge to solve the problem.
