The 111 MW Rasuwagadhi Hydropower Project resumed supplying 74MW to the grid after repairs from a glacial flood last year. Full capacity is technically ready but limited by the NEA due to low demand. Flood damage was estimated at Rs3.5 billion.
Rasuwagadi resumes

