An agreement was signed to reconstruct 4 suspension bridges by the under-construction Tanahun Hydropower Project. The agreement was signed between the reservoir company and a joint venture contractor from Kathmandu. River crossings at Chulesi, Tunibote, Dhwang, and Tutuwa are expected to be built by mid-2028.